中文题名: | 扬尘治理管控下房地产施工进度管理——以HK地产廊坊项目为例 |
姓名: | |
保密级别: | 公开 |
论文语种: | 中文 |
学科代码: | 085239 |
学科专业: | |
学生类型: | 硕士 |
学位: | 工程硕士 |
学位类型: | |
学位年度: | 2021 |
校区: | |
学院: | |
研究方向: | 房地产 |
第一导师姓名: | |
第一导师单位: | |
提交日期: | 2021-06-20 |
答辩日期: | 2021-05-26 |
外文题名: | Real estate construction schedule management under dust emission control——Take the HK Real Estate Langfang Project as an example |
中文关键词: | |
外文关键词: | Real estate ; construction ; dust control ; schedule planning |
中文摘要: |
进入21世纪以来,房地产作为关系到广大国民居住需求的支柱性产业受到国家重点扶持。近些年北方地区大气环境持续处于低水平,严重影响国民健康。国家为此对影响大气环境的各行业影响大气环境的行为进行严厉的管控。而建筑施工作为房地产开发过程中最为重要的环节,不可避免的成为重点管控对象,从而对项目的进度计划,成本质量等方面产生极大影响。 本文为解决因大气污染停工管控项目工程进度影响的问题,通过查阅资料,归纳统计并分析总结,使用project生成甘特图,利用关键路线法和横道图比较法等方法和工具,以HK地产廊坊项目一期为例,就施工过程中,因大气污染管控造成的进度影响进行讨论研究。在二期项目中通过拆分工作项,分析污染源,统计大气污染天气情况及因污染而被迫停工时间,进而调整计划,规避风险,也利用PDCA循环进行计划管控,制订保障措施,使项目最终能在合理成本和满足质量标准的情况下按约定交房日期完成交付目标,同时也为本项目后期开发以及类似项目的开发提供参考。 |
外文摘要: |
Since the 21st century, real estate, as a pillar industry related to the needs of the majority of people, has been supported by the state. In recent years, the atmospheric environment in northern China has been at a low level, which seriously affects the national health. Therefore, the state strictly controls the behaviors of various industries affecting the atmospheric environment. As the most important link in the real estate development process, construction construction inevitably becomes the key control object, which has a great impact on the project schedule, cost quality and other aspects. In order to solve the problem of the project schedule impact due to air pollution shutdown control project, this paper analyzes and summarizes the progress of the project by consulting the data, summarizing and summarizing, using project to generate Gantt chart, using the methods and tools such as key route method and cross road map comparison method, taking the phase I project of Hong Kong real estate Langfang project as an example, the progress impact caused by air pollution control during the construction process is discussed. In the second phase project, the project divides the work items, analyzes the pollution sources, statistics the weather conditions of air pollution and the forced shutdown time due to pollution, then adjusts the plan, avoids risks, also uses PDCA cycle to control the plan, and formulates the safeguard measures, so that the project can finally achieve the delivery target according to the agreed delivery date in the case of reasonable cost and meeting the quality standards, At the same time, it also provides reference for the later development of the project and the development of similar projects. |